Typical joint locations
- Head of wall to soffit
- Floor-to-wall junctions
- Construction / movement joints as detailed
Linear
Linear gap seals and movement joints where the drawings show a fire-resisting joint system. Head-of-wall, floor-to-wall, and construction joints as detailed.
We install the joint system shown on the issued details. That includes linear gap seals at compartment lines and movement joints where a tested system is named.
We do not invent a joint detail on site. If the specification is silent, the query is referred to the design party. We then install what they issue.
Head-of-wall and perimeter joints often sit after drylining. We plan labour against the programme you issue. Catch-up visits are quoted as attendances, not assumed.