Useful on an M&E package
- Penetration schedule
- Services drawings
- Named firestop systems
- Floor-by-floor programme
Buyers
Penetration sealing after pipes, cables and ducts are installed. We work from your schedules and the issued fire details.
M&E create the openings. A firestop specialist reinstates compartmentation. That is the typical path on Dublin and Leinster fit-out and new-build. We price that reinstatement from the schedule and the named systems — not from a walk-round of the riser.
If you hold a penetration schedule, send it with the drawings. If the schedule is incomplete, unspecified openings are provisional sums. We will not convert the subcontract into a hunt for extra holes because first-fix ran ahead of the drawing.
We do not take M&E design, and we do not take firestop design. Mixed-service openings are installed only where the issued system covers them. If it does not, the query goes back to the design party.
Penetration sealing · How a quotation is prepared · Request a quotation
Photo log and seal register referenced to IDs, so your package can be read into the O&Ms and the Assigned Certifier’s file.