Photo log
Before, during and after. Referenced to seal IDs so the pack can be read against the register.
BCAR
Construction ancillary for installation to issued details. Photo log, seal register and product evidence for the Assigned Certifier. Not a design certificate.
Install-only does not mean an absence of paperwork. It means we do not issue a design certificate. The Assigned Certifier still requires evidence that the installation matches the issued details.
Before, during and after. Referenced to seal IDs so the pack can be read against the register.
ID, location, system, date, installer. Used by the O&M file and the Assigned Certifier.
Data sheets, Declarations of Performance, and fire test / ETA evidence for the systems installed.
Construction ancillary certificate: installation to issued details only. CIF-style Cs / Css family — wording confirmed with the Assigned Certifier on each project. Not a design ancillary.
| Seal ID | Location | Substrate | System | Date | Installer |
|---|---|---|---|---|---|
| R2-L3-014 | Riser 2, level 3, north | Masonry wall | As specified | — | — |
| R2-L3-015 | Riser 2, level 3, north | Masonry wall | As specified | — | — |
| C1-L1-008 | Corridor 1, level 1 | Shaft wall | As specified | — | — |
| HW-L4-003 | Head of wall, level 4 | Drylining | As specified | — | — |
| CB-L2-021 | Cavity line, level 2, west | As specified | As specified | — | — |
Specimen layout — not a live project.
TGD B / Part B language. Irish BCAR, not UK forms. We do not issue design ancillaries and we do not hold professional indemnity for design.