Firestop installation · Dublin and surrounding counties

Firestop installation for main contractors and M&E

Labour and certified materials installed to the drawings and specification you issue. New-build and fit-out packages — not a survey-led remediation practice.

  • Install only
  • No design duty
  • BCAR install ancillary
  • TGD B / Part B

Why Líneach

Site process, not marketing claims

We do not publish project counts or star ratings. What we can show a main contractor is the paperwork they already ask for.

SOLAS Safe Pass

Operatives hold Safe Pass. RAMS are issued before works commence, against the site you name.

BCAR install ancillary

Construction ancillary for installation to issued details only. Photo log, seal register and product evidence for the Assigned Certifier. Not a design ancillary.

Tax and insurance

Insurance certificates and tax clearance are supplied as part of the appointment process, when the main contractor requires them.

Irish TGD B / Part B

Compartmentation at service openings as TGD B requires. Irish BCAR forms. We do not work to UK Approved Document B.

Buyers: main contractors with a specialist package already drawn, and M&E subcontractors who need openings sealed after first-fix. We are not a survey-led remediation practice.

Commercial

How a quotation is prepared

01

Submit the documents

Drawings, fire specification and schedules. We price from what is issued.

02

Labour and materials

Certified systems named on the specification. Not a design fee.

03

Provisional sums

Unspecified openings are treated as provisional. We do not search the building for additional openings.

04

Handover pack

Photographs, seal register, and an install-to-details ancillary for the Assigned Certifier.

Scope of works

What is in

You hold the fire strategy, specification and drawings. We install to them. The quotation is labour and certified materials against the issued design. Print the IN / OUT page with a quotation if useful.

IN

Labour

Site labour to install the seals shown on the issued drawings. Operatives hold SOLAS Safe Pass. RAMS are issued before works commence.

IN

Certified materials

Manufacturer-tested systems named on your specification. Product evidence — data sheets, Declarations of Performance, and test / ETA documents — as specified.

IN

To issued details

Penetrations, linear joints and cavity barriers as drawn. Missing details are referred to the design party. We do not invent or substitute details on site.

Scope exclusions

What is out

Exclusions are stated so the subcontract matches the works.

OUT

No design

We do not select systems or approve the fire strategy. Variations that require a new detail are referred to the designer.

OUT

No surveys

We do not survey buildings to locate openings. A find-all-penetrations duty is not included in the quotation.

OUT

No design duty

The contract states that we carry no design responsibility. We do not hold professional indemnity for design. We do not sign design ancillaries.

OUT

Design partner

Design or survey can sit with a partner on a separate contract. The quotation remains for installation only.

FAQ

Questions we are asked

No. We are install-only. We supply labour and certified materials and install to drawings and specifications issued by others. We do not accept design responsibility.

No. We do not survey buildings, locate missing penetrations, or select systems. Where a project requires a survey or design, that work can sit with a partner on a separate contract. Our quotation remains for installation only.

Issued drawings, the fire specification or fire strategy extracts, and penetration or joint schedules where they exist. Unspecified openings are treated as provisional sums, not as an open-ended search of the building.

Dublin, Meath, Kildare, Wicklow and Louth. Base: A83 FC42, Ardnamullan, Clonard, Co. Meath (Enfield / Summerhill).

Yes, for the installation. Photo log, seal register, specified product evidence, and a construction ancillary certificate stating installation to issued details only. We do not sign design ancillaries.

TGD B, Part B and BCAR. Fire-stopping maintains compartmentation at service openings as TGD B requires. We do not work to UK Approved Document B.

The query is referred to the design party. We do not invent or substitute a firestop detail on site. Installation of that opening waits until a detail is issued. That may be a variation.

No. We install what is shown on the issued drawings and schedules. A find-all-penetrations duty is not included. Unspecified openings are priced as provisional sums, not as an open-ended hunt.

Full FAQ

Quotation

Request a Quotation

Main contractors and M&E subcontractors: please provide the site location and the documents you can issue. We quote for installation only.

Please include the site location and the drawings or specifications available for pricing.

Alternatively, call +353 87 919 9059 or email dean@lineach.com.