SOLAS Safe Pass
Operatives hold Safe Pass. RAMS are issued before works commence, against the site you name.
Firestop installation · Dublin and surrounding counties
Labour and certified materials installed to the drawings and specification you issue. New-build and fit-out packages — not a survey-led remediation practice.
What we install
Quoted from issued details. Missing details are referred to the design party. Each package has its own page.
Why Líneach
We do not publish project counts or star ratings. What we can show a main contractor is the paperwork they already ask for.
Operatives hold Safe Pass. RAMS are issued before works commence, against the site you name.
Construction ancillary for installation to issued details only. Photo log, seal register and product evidence for the Assigned Certifier. Not a design ancillary.
Insurance certificates and tax clearance are supplied as part of the appointment process, when the main contractor requires them.
Compartmentation at service openings as TGD B requires. Irish BCAR forms. We do not work to UK Approved Document B.
Buyers: main contractors with a specialist package already drawn, and M&E subcontractors who need openings sealed after first-fix. We are not a survey-led remediation practice.
Commercial
Drawings, fire specification and schedules. We price from what is issued.
Certified systems named on the specification. Not a design fee.
Unspecified openings are treated as provisional. We do not search the building for additional openings.
Photographs, seal register, and an install-to-details ancillary for the Assigned Certifier.
Scope of works
You hold the fire strategy, specification and drawings. We install to them. The quotation is labour and certified materials against the issued design. Print the IN / OUT page with a quotation if useful.
Site labour to install the seals shown on the issued drawings. Operatives hold SOLAS Safe Pass. RAMS are issued before works commence.
Manufacturer-tested systems named on your specification. Product evidence — data sheets, Declarations of Performance, and test / ETA documents — as specified.
Penetrations, linear joints and cavity barriers as drawn. Missing details are referred to the design party. We do not invent or substitute details on site.
Scope exclusions
Exclusions are stated so the subcontract matches the works.
We do not select systems or approve the fire strategy. Variations that require a new detail are referred to the designer.
We do not survey buildings to locate openings. A find-all-penetrations duty is not included in the quotation.
The contract states that we carry no design responsibility. We do not hold professional indemnity for design. We do not sign design ancillaries.
Design or survey can sit with a partner on a separate contract. The quotation remains for installation only.
Coverage
Based at A83 FC42, Ardnamullan, Clonard, Co. Meath — Enfield / Summerhill. Access to west and north Dublin, the M4 / M7, and the M1. Not a nationwide service.
FAQ
Quotation
Main contractors and M&E subcontractors: please provide the site location and the documents you can issue. We quote for installation only.
Phone +353 87 919 9059
Email dean@lineach.com